This is just a quick post about why I don’t support the district’s $191 million bond proposal. (I’ll be posting in more detail about this topic in the weeks ahead.)
If the bond proposal were limited to the renovations to our existing school buildings and to building new capacity where there’s a demonstrated need for it, I would support it. I don’t support the proposal as it stands, though, because it includes too many projects that would expand capacity at schools where our projections do not show future enrollment to justify those expansions.
Our recent ten-year enrollment projections don’t come anywhere close to supporting the amount of capacity the plan would build, especially at the elementary level:
(Source: Pages 89, 91, and 93 here and Column O here.)
I do have some other concerns as well—for example, about some of the particular choices about where to add capacity and to some extent about our capacity assessments themselves, which have been a moving target. (More on those issues in future posts.) But my primary objection is that we’re building new capacity without any projections showing that we’ll have the kids to fill the seats.
Maybe our enrollment will exceed our projections! That’s certainly possible, especially in areas of the district where there’s a lot of potential growth. It’s even possible that we’re not planning enough capacity for some areas. (Some in the North Corridor are concerned that bond passage will lock them out of capacity that they will need sooner than expected.) It’s also possible that actual enrollment will be lower than projected in at least some areas. Enrollment projections, years out, are very uncertain. That’s a good reason not to commit to a capacity plan that extends seven years out.
It would make more sense to fund two or three years of needed projects—including the renovation and air conditioning projects, and the new capacity where there’s a clear need—and then re-assess the district’s needs at that time. I wish this year’s bond proposal had done that, but I think we’d be better off going back to the public next year with a better proposal than passing one this year that builds too many unjustified capacity expansions.
thinking out loud about school in the iowa city community school district and beyond
_________________________________________________________________
Monday, May 8, 2017
Saturday, May 6, 2017
“Something for everyone”
There are two competing approaches for how to design a school bond proposal that can appeal to the voters. The first is to create a proposal that identifies compelling needs and then convince the voters of the importance of the projects. The other is to create a proposal that contains “something for everyone,” so more voters will have a personal stake in some part of the proposal. The first approach appeals primarily to the voters’ public-spirited instincts; the second approach appeals at least as much to the voters’ personal interests.
When our school board was deciding how to structure its bond proposal, the second approach prevailed. It was important, the argument went, that the bond contain many years’ worth of projects spread throughout the district, so it would have broad-based appeal.
I’m much more comfortable going to the public with a list of compelling needs than with a larger list that is more geographically distributed. I believe this district’s voters will support projects that benefit other parts of the district when the need is clear. This was true, for example, in 1995, when 70% of the voters supported a bond to build an elementary school in Coralville.
Moreover, there are several problems with the “something for everyone” approach. One is that by pursuing it, the board is essentially admitting that need is not the driving principle. Second, the throw-it-all-in approach drives up the cost—which creates its own counterarguments, both public-spirited and self-interested. Third, bond elections bring out many voters who don’t have kids in the schools, and who thus don’t have the same degree of self-interest in school projects, but who might be persuaded by a smaller set of projects with more compelling need.
There is also a risk involved in encouraging voters to approach the bond by asking “What’s in it for me?” The bond proposal is big, but it has to stop somewhere. As a result, the district now has a list of “future needs” that will not be covered by the bond; those projects will need to secure funding some other way, such as with a future bond proposal. Yet a look at the list shows that those projects are not geographically spread out at all. Under the “something for everyone” philosophy, why would the east side of Iowa City—the part of the district with the greatest number of voters—ever support a bond for those projects?
Over the long term, it would make more sense to cultivate the voters’ willingness to support necessary projects regardless of where the needs arise.
When our school board was deciding how to structure its bond proposal, the second approach prevailed. It was important, the argument went, that the bond contain many years’ worth of projects spread throughout the district, so it would have broad-based appeal.
I’m much more comfortable going to the public with a list of compelling needs than with a larger list that is more geographically distributed. I believe this district’s voters will support projects that benefit other parts of the district when the need is clear. This was true, for example, in 1995, when 70% of the voters supported a bond to build an elementary school in Coralville.
Moreover, there are several problems with the “something for everyone” approach. One is that by pursuing it, the board is essentially admitting that need is not the driving principle. Second, the throw-it-all-in approach drives up the cost—which creates its own counterarguments, both public-spirited and self-interested. Third, bond elections bring out many voters who don’t have kids in the schools, and who thus don’t have the same degree of self-interest in school projects, but who might be persuaded by a smaller set of projects with more compelling need.
There is also a risk involved in encouraging voters to approach the bond by asking “What’s in it for me?” The bond proposal is big, but it has to stop somewhere. As a result, the district now has a list of “future needs” that will not be covered by the bond; those projects will need to secure funding some other way, such as with a future bond proposal. Yet a look at the list shows that those projects are not geographically spread out at all. Under the “something for everyone” philosophy, why would the east side of Iowa City—the part of the district with the greatest number of voters—ever support a bond for those projects?
Over the long term, it would make more sense to cultivate the voters’ willingness to support necessary projects regardless of where the needs arise.
Friday, May 5, 2017
School board agenda for Tuesday, May 9
This week, the board will hear a quarterly financial report; otherwise, the agenda is heavy on consent calendar items and light on much else. The full agenda is here; feel free to chime in with a comment on anything catches your attention.
Wednesday, May 3, 2017
Horace Mann drop-off issue
There was a good turnout—about eighty people—for last night’s listening post about the future design of the Horace Mann Elementary School site. People asked questions and gave feedback on several design options, especially the latest iteration of scenarios, which consisted of Scenarios “H-1,” “H-2,” and “Option Z.”
Several people raised questions about where parents would be able to drop off and pick up students. Each scenario contained some space designated for that purpose, but what looks nice on paper is not always so neat in practice. Option H-1, for example, put the drop-off area here:
But that would seem like a recipe for creating a backed-up line of cars on Dodge Street during rush hour, in the same area where any buses would be pulling up. Other options involved routing cars around the park behind the school.
I’m concerned, though, about whether we’re really grappling with just how much of an increase we’re likely to see in the number of cars dropping off at Mann. That increase isn’t because of the renovation; it’s because of the planned boundary change that will take effect when the renovation is done. Under the new boundaries, the Foster Road/Peninsula neighborhood, most of which was eligible for a bus to Mann, will no longer be part of Mann’s attendance zone. In its place, Mann will be gaining territory east of Seventh Avenue. Very few (if any) of the kids that are being added to Mann’s zone are eligible for a bus, and they’re far enough away that they’re unlikely to be walking. In short, Mann will be exchanging dozens of students who arrive by bus for dozens of students who will arrive by car. That means we can expect to see a steep increase in the number of cars dropping off and picking up kids.
I’m not sure whether that number of cars will be satisfactorily accommodated by any of the scenarios we’ve seen. There was some discussion of routing cars one-way through the roads around the park behind Mann, but I’d still be concerned about the potential volume of cars, especially since those are narrow, residential streets. (One comparison: at Hoover, there is a one-way drop-off/pickup route through the school’s parking lot, which does not simultaneously function as a city street, yet the drop-off/pickup line is often two or even three cars deep.)
None of the district’s drop-off/pickup situations are ideal, and maybe the neighborhood will be able to deal with the influx of cars. (Please chime in with comments about other possible solutions!) But I doubt there will be any alternative as effective as simply keeping Mann’s attendance zone roughly similar to its current zone. The kids who live in the Foster Road/Peninsula area will be bus-eligible no matter what school they’re assigned to. Keeping them at Mann is a way to reduce the number of cars converging on a school site that is particularly ill-suited to a high volume of drop-offs.
Next year, the board has to redraw some of the elementary boundaries it drew last year, because of the decision to build the new North Liberty elementary school in a different place than initially planned. When it does, it should also consider whether Mann’s planned boundaries are workable, given the site. It will be much easier to address any problems before the site is completed and the new boundaries go into effect than afterward.
Note: I see the drop-off issue as separate from the issue about on-site parking. It is hard enough on the Mann site to deal with the issue of staff, visitor, and disability-accessible parking; it is not feasible to use a parking lot to accommodate drop-off and pickup. Moreover, drop-off and pickup spaces have to be designed with traffic flow in mind.
Several people raised questions about where parents would be able to drop off and pick up students. Each scenario contained some space designated for that purpose, but what looks nice on paper is not always so neat in practice. Option H-1, for example, put the drop-off area here:
But that would seem like a recipe for creating a backed-up line of cars on Dodge Street during rush hour, in the same area where any buses would be pulling up. Other options involved routing cars around the park behind the school.
I’m concerned, though, about whether we’re really grappling with just how much of an increase we’re likely to see in the number of cars dropping off at Mann. That increase isn’t because of the renovation; it’s because of the planned boundary change that will take effect when the renovation is done. Under the new boundaries, the Foster Road/Peninsula neighborhood, most of which was eligible for a bus to Mann, will no longer be part of Mann’s attendance zone. In its place, Mann will be gaining territory east of Seventh Avenue. Very few (if any) of the kids that are being added to Mann’s zone are eligible for a bus, and they’re far enough away that they’re unlikely to be walking. In short, Mann will be exchanging dozens of students who arrive by bus for dozens of students who will arrive by car. That means we can expect to see a steep increase in the number of cars dropping off and picking up kids.
I’m not sure whether that number of cars will be satisfactorily accommodated by any of the scenarios we’ve seen. There was some discussion of routing cars one-way through the roads around the park behind Mann, but I’d still be concerned about the potential volume of cars, especially since those are narrow, residential streets. (One comparison: at Hoover, there is a one-way drop-off/pickup route through the school’s parking lot, which does not simultaneously function as a city street, yet the drop-off/pickup line is often two or even three cars deep.)
None of the district’s drop-off/pickup situations are ideal, and maybe the neighborhood will be able to deal with the influx of cars. (Please chime in with comments about other possible solutions!) But I doubt there will be any alternative as effective as simply keeping Mann’s attendance zone roughly similar to its current zone. The kids who live in the Foster Road/Peninsula area will be bus-eligible no matter what school they’re assigned to. Keeping them at Mann is a way to reduce the number of cars converging on a school site that is particularly ill-suited to a high volume of drop-offs.
Next year, the board has to redraw some of the elementary boundaries it drew last year, because of the decision to build the new North Liberty elementary school in a different place than initially planned. When it does, it should also consider whether Mann’s planned boundaries are workable, given the site. It will be much easier to address any problems before the site is completed and the new boundaries go into effect than afterward.
Note: I see the drop-off issue as separate from the issue about on-site parking. It is hard enough on the Mann site to deal with the issue of staff, visitor, and disability-accessible parking; it is not feasible to use a parking lot to accommodate drop-off and pickup. Moreover, drop-off and pickup spaces have to be designed with traffic flow in mind.
Saturday, April 29, 2017
A response to Jeff McGinness
Well, bond campaign season is upon us, and it sometimes seems as if the supporters of the bond were expecting no one to point out counterarguments. I was quoted in a Gazette piece today, and former board member Jeff McGinness, who co-chaired the committee that developed the initial facilities plan recommendation, had this to say about it:
McGinness’s statements that I “essentially campaigned on killing the bond” and that I’ve “voted against virtually every admin proposal” are demonstrably false. As to the former, my campaign position is the same one I have now:
As for the statement that I’ve “voted against virtually every admin proposal,” I just reviewed all the votes at our regular board meetings: I have voted “no” 29 times and “yes” 231 times (and that’s not even counting consent calendar items separately). At 60% of the meetings, I did not cast a single “no” vote. Not all the “yes” votes were supporting administrative recommendations, but a whole lot of them were. Again, some people want board members to vote “yes” more than 89% of the time, but that’s hardly voting against every administrative proposal.
McGinness says that my blog contains intentional misstatements, but since he doesn’t cite any, I can’t refute the charge or correct any errors.
As for Sullivan’s Gazette piece, it was pretty faithful to what I said to him when he called me. One arguable inaccuracy in his piece is that the bond wouldn’t “fund a replacement for Hoover Elementary,” at least if that’s meant to refer to Hoover East, which is not bond-funded and which does not actually “replace” Hoover. Sullivan cites my blog (which cited this) for the statement that the plan would put elementary capacity at 1600 seats more than projected enrollment; the district has since revised its capacity numbers, and then revised them again, but that figure is still pretty close to what the district’s own documents show. (Compare Column O with Column M.) In general, my concern is that the enrollment projections are speculative enough that we shouldn’t use them to justify commitments that are years out on the timeline; more on that in an upcoming post.
The bond vote is still four and a half months away. There is lots of time for making arguments and counterarguments before anyone has to vote. When I make my arguments, I try always to include links for any factual assertions. My advice to voters is: take your time and consider both sides. If the proposal is as strong as its supporters contend, they should have nothing to worry about.
McGinness’s statements that I “essentially campaigned on killing the bond” and that I’ve “voted against virtually every admin proposal” are demonstrably false. As to the former, my campaign position is the same one I have now:
The district will need to ask the voters to pass a bond to follow through on the district’s facilities plan. We need to make sure the proposal makes sense and that the voters trust the district with the money. Passing a bond requires not cheerleading or groupthink but transparency, candor, inclusiveness, and critical thinking.Some might prefer the cheerleading approach, but that is hardly campaigning on killing the bond. In my view, what risks killing the bond is having it cover capacity expansions—some of which are up to seven years out on the timeline—without any indication that future enrollment will justify them.
As for the statement that I’ve “voted against virtually every admin proposal,” I just reviewed all the votes at our regular board meetings: I have voted “no” 29 times and “yes” 231 times (and that’s not even counting consent calendar items separately). At 60% of the meetings, I did not cast a single “no” vote. Not all the “yes” votes were supporting administrative recommendations, but a whole lot of them were. Again, some people want board members to vote “yes” more than 89% of the time, but that’s hardly voting against every administrative proposal.
McGinness says that my blog contains intentional misstatements, but since he doesn’t cite any, I can’t refute the charge or correct any errors.
As for Sullivan’s Gazette piece, it was pretty faithful to what I said to him when he called me. One arguable inaccuracy in his piece is that the bond wouldn’t “fund a replacement for Hoover Elementary,” at least if that’s meant to refer to Hoover East, which is not bond-funded and which does not actually “replace” Hoover. Sullivan cites my blog (which cited this) for the statement that the plan would put elementary capacity at 1600 seats more than projected enrollment; the district has since revised its capacity numbers, and then revised them again, but that figure is still pretty close to what the district’s own documents show. (Compare Column O with Column M.) In general, my concern is that the enrollment projections are speculative enough that we shouldn’t use them to justify commitments that are years out on the timeline; more on that in an upcoming post.
The bond vote is still four and a half months away. There is lots of time for making arguments and counterarguments before anyone has to vote. When I make my arguments, I try always to include links for any factual assertions. My advice to voters is: take your time and consider both sides. If the proposal is as strong as its supporters contend, they should have nothing to worry about.
Wednesday, April 26, 2017
Community meeting about Horace Mann Elementary
This coming Tuesday, May 2, the school board will hold a community meeting to get public input on how to design the site plan for the renovations to Horace Mann Elementary School. The meeting will go from 6:00 to 7:30 p.m. at Mann. The meeting agenda is here.
The attachment to the agenda shows several possible scenarios, which are not intended to be exclusive of other potential ideas. The most recent scenarios, developed after the board’s joint session with the Iowa City City Council, are “H-1” and “H-2.” At last night’s meeting, a community member presented an interesting alternative, labeled “Option Z” (shown above; click to enlarge). It’s possible that the agenda could be further supplemented before Tuesday’s meeting.
Discussions so far have focused on (1) how placement of the new addition will affect outdoor play spaces, and (2) how to deal with space for parking and parent drop-off. One possible area for discussion is whether there are ways to think outside the box about how to accommodate parking needs without unnecessarily burdening outdoor play areas and the neighboring park (which has served informally as a kind of extension of the Mann play areas).
Comments welcome!
UPDATE: Some have asked about gym size comparisons with other schools. Here is a chart showing current and planned gym sizes.
Tuesday, April 25, 2017
Should before- and after-school programs be responsible for raising test scores?
At tonight’s meeting, the board will get an update on the district’s contract negotiations with the providers of our before- and after-school programs (BASPs). Two of the proposed changes to the contracts have prompted some discussion.
First, the district is asking the BASPs to commit to furthering the district’s goals of raising math and reading proficiency rates and “creating culturally inclusive and responsive school environments and classroom instruction, with a focus on equitable outcomes for students in protected classes.” (See also the BASP Q&A here.)
It is not clear to me exactly what changes the district is expecting from the BASPs to help raise reading and math proficiency rates. It’s my understanding that the BASPs currently give the kids a number of activity choices, including reading or homework time, but that they don’t engage in actual instruction per se. The children are already spending seven hours of the day in school; when the district added a half hour to their school day two years ago, we heard ongoing concerns about the long day that we were imposing on young kids. Recess and lunch time during the school day is minimal. I’m not at all persuaded that “more is always better” when it comes to instructional time. (See this post from years ago.) Especially given the lack of concrete details about what this new clause will require, I don’t blame people for being concerned about it.
Second, the district is asking the BASPs to commit to holding a certain number of spots open at each site to serve students experiencing homelessness or other emergency situations. This seems like a worthy goal, but it does impose a cost on the BASPs (who may have to turn away families on their waiting lists to leave those spaces open), which could affect their staffing and programming. I don’t have an immediate opinion on what is reasonable to expect from the BASPs here, but I’d like to hear the pros and cons.
The Q&A gives the impression that the district is playing hardball with the BASPs. It goes out of its way to state that BASPs that don’t like the proposed terms may end up getting charged for the use of the school buildings or even replaced with different providers. Maybe the district can offer a persuasive rationale for this approach, but it does come as a bit of a surprise, given that the BASPs are non-profit organizations, often run by parent boards, which in many cases have longstanding relationships with the district and with district parents.
Meanwhile, in related news, President Trump’s proposed budget would eliminate the 21st Century Community Learning Centers program, which funds before- and after-school and summer programs, on the grounds that “The programs lacks [sic] strong evidence of meeting its objectives, such as improving student achievement.” In my view, providing child care to working parents who need it is a perfectly good objective in and of itself, regardless of whether it raises anyone’s test scores. (See Freddie deBoer’s post here for an extended version of that argument.)
First, the district is asking the BASPs to commit to furthering the district’s goals of raising math and reading proficiency rates and “creating culturally inclusive and responsive school environments and classroom instruction, with a focus on equitable outcomes for students in protected classes.” (See also the BASP Q&A here.)
It is not clear to me exactly what changes the district is expecting from the BASPs to help raise reading and math proficiency rates. It’s my understanding that the BASPs currently give the kids a number of activity choices, including reading or homework time, but that they don’t engage in actual instruction per se. The children are already spending seven hours of the day in school; when the district added a half hour to their school day two years ago, we heard ongoing concerns about the long day that we were imposing on young kids. Recess and lunch time during the school day is minimal. I’m not at all persuaded that “more is always better” when it comes to instructional time. (See this post from years ago.) Especially given the lack of concrete details about what this new clause will require, I don’t blame people for being concerned about it.
Second, the district is asking the BASPs to commit to holding a certain number of spots open at each site to serve students experiencing homelessness or other emergency situations. This seems like a worthy goal, but it does impose a cost on the BASPs (who may have to turn away families on their waiting lists to leave those spaces open), which could affect their staffing and programming. I don’t have an immediate opinion on what is reasonable to expect from the BASPs here, but I’d like to hear the pros and cons.
The Q&A gives the impression that the district is playing hardball with the BASPs. It goes out of its way to state that BASPs that don’t like the proposed terms may end up getting charged for the use of the school buildings or even replaced with different providers. Maybe the district can offer a persuasive rationale for this approach, but it does come as a bit of a surprise, given that the BASPs are non-profit organizations, often run by parent boards, which in many cases have longstanding relationships with the district and with district parents.
____________________
Meanwhile, in related news, President Trump’s proposed budget would eliminate the 21st Century Community Learning Centers program, which funds before- and after-school and summer programs, on the grounds that “The programs lacks [sic] strong evidence of meeting its objectives, such as improving student achievement.” In my view, providing child care to working parents who need it is a perfectly good objective in and of itself, regardless of whether it raises anyone’s test scores. (See Freddie deBoer’s post here for an extended version of that argument.)
Sunday, April 23, 2017
School board agenda for April 25
Some of the items on the board’s agenda this week:
We’ll vote on bond proposal language to put on the ballot in September. See this post for details.
We’ll get an update on the district’s negotiations over possible changes to the district’s contracts with its providers of before-and-after-school programs. (Update: For more information about this issue, see this post.)
We’ll consider a recommendation for 2017-18 salary and benefits increases for our non-unionized groups of employees.
We’ll hear a review of the district’s grounds care practices and get an update from the Integrated Pest Management task force, which has been examining the district’s use of pesticides and herbicides on school grounds.
We’ll consider whether to approve $2.4 million in expenditures to buy and lease computer equipment, much of which will go toward funding the district’s plan to provide all secondary students with Chromebook laptops for use in the classroom and at home. I describe my concerns about this recommendation in this post.
At our work session, we’ll continue our discussion of the planned renovation of Horace Mann Elementary. The latest scenarios are here. We’ll also continue to discuss the bond and the facilities plan generally.
All that and more! The full agendas are here and here. Feel free to chime in with a comment about anything that catches your attention.
We’ll vote on bond proposal language to put on the ballot in September. See this post for details.
We’ll get an update on the district’s negotiations over possible changes to the district’s contracts with its providers of before-and-after-school programs. (Update: For more information about this issue, see this post.)
We’ll consider a recommendation for 2017-18 salary and benefits increases for our non-unionized groups of employees.
We’ll hear a review of the district’s grounds care practices and get an update from the Integrated Pest Management task force, which has been examining the district’s use of pesticides and herbicides on school grounds.
We’ll consider whether to approve $2.4 million in expenditures to buy and lease computer equipment, much of which will go toward funding the district’s plan to provide all secondary students with Chromebook laptops for use in the classroom and at home. I describe my concerns about this recommendation in this post.
At our work session, we’ll continue our discussion of the planned renovation of Horace Mann Elementary. The latest scenarios are here. We’ll also continue to discuss the bond and the facilities plan generally.
All that and more! The full agendas are here and here. Feel free to chime in with a comment about anything that catches your attention.
A laptop in every backpack: do the benefits outweigh the costs?
Our district has been moving forward with a plan to provide every secondary student with a Chromebook laptop for use in the classroom and at home (and to provide more devices in elementary schools as well). At this week’s meeting, the board will be asked to approve a $2.4 million technology purchase and lease, much of which will go toward funding this 1:1 laptop initiative. That money represents the tip of the iceberg of what will become a continuing expense, since the laptops are expected to have a three-year lifespan.
I’m not yet persuaded that the benefits of this initiative outweigh the costs. Our administrators have conceded that there is no hard data to show that providing every student with a laptop will increase student achievement (however defined). One the one hand, I’m glad to see anyone recognizing that test scores don’t capture the full effect of any educational practices; I’d be more persuaded, though, if this stance weren’t so selectively deployed. During our discussion of it at a recent work session, the initiative sounded less like the result of a careful consideration of costs and benefits and more like we are simply following a trend among districts elsewhere.
(To hear the response to the question, “Can we expect a measurable increase [in test scores] from this?”, and to hear some of the arguments in favor of the initiative from board members and administrators, listen for a few minutes here. See also Karen W.’s post here.)
As is too often the case at our meetings, the board made little or no attempt to grapple with counterarguments or to consider opportunity costs. It is not hard to find arguments that the proliferation of screens in school (and at home) does not promote and may even undermine learning. See here, here, here, and here, for just a few quick examples. I’m not endorsing those conclusions, but the board is not doing its job if it considers only arguments in favor and not arguments against. (See this post.)
There are also unresolved questions about the effect of the 1:1 initiative on the privacy of student data and on the district’s selection of textbooks. Will the district shift toward e-books and online-only materials instead of textbooks? If so, how will that affect curriculum and instruction?
There is also the fact that the money to fund the 1:1 initiative comes from SAVE, which is also a source of money for our facilities plan. If the pending bond proposal does not pass, we may wish that we had not spent those SAVE funds on student laptops, especially since the dollar figure here is actually larger than some of the smaller projects in the facilities plan.
There is, of course, enormous money to be made by selling technology to school districts, which ought to make the board give particular scrutiny to a large, ongoing expense like this one. Read about Los Angeles’ disastrous 1:1 iPad experience here.
Readers, what are your thoughts? Am I being too skeptical? Is it futile even to consider holding back the tide on school-provided devices?
I’m not yet persuaded that the benefits of this initiative outweigh the costs. Our administrators have conceded that there is no hard data to show that providing every student with a laptop will increase student achievement (however defined). One the one hand, I’m glad to see anyone recognizing that test scores don’t capture the full effect of any educational practices; I’d be more persuaded, though, if this stance weren’t so selectively deployed. During our discussion of it at a recent work session, the initiative sounded less like the result of a careful consideration of costs and benefits and more like we are simply following a trend among districts elsewhere.
(To hear the response to the question, “Can we expect a measurable increase [in test scores] from this?”, and to hear some of the arguments in favor of the initiative from board members and administrators, listen for a few minutes here. See also Karen W.’s post here.)
As is too often the case at our meetings, the board made little or no attempt to grapple with counterarguments or to consider opportunity costs. It is not hard to find arguments that the proliferation of screens in school (and at home) does not promote and may even undermine learning. See here, here, here, and here, for just a few quick examples. I’m not endorsing those conclusions, but the board is not doing its job if it considers only arguments in favor and not arguments against. (See this post.)
There are also unresolved questions about the effect of the 1:1 initiative on the privacy of student data and on the district’s selection of textbooks. Will the district shift toward e-books and online-only materials instead of textbooks? If so, how will that affect curriculum and instruction?
There is also the fact that the money to fund the 1:1 initiative comes from SAVE, which is also a source of money for our facilities plan. If the pending bond proposal does not pass, we may wish that we had not spent those SAVE funds on student laptops, especially since the dollar figure here is actually larger than some of the smaller projects in the facilities plan.
There is, of course, enormous money to be made by selling technology to school districts, which ought to make the board give particular scrutiny to a large, ongoing expense like this one. Read about Los Angeles’ disastrous 1:1 iPad experience here.
Readers, what are your thoughts? Am I being too skeptical? Is it futile even to consider holding back the tide on school-provided devices?
Latest version of bond proposal language
This Tuesday, the board will vote on the bond proposal language that will appear on the ballot this September. Here is the draft language that appears on the meeting agenda:
Here is a red-lined version showing changes from the previous draft (underlined portions represent new language):
Many people have asked about whether passage of the bond referendum locks the district in to doing the projects listed in the bond language or in the district’s facilities plan. That turns out to be a complicated legal question to which the answer is not entirely certain; I’ll be posting more about that issue.
Please chime in with comments about the draft language.
Shall the Board of Directors of the Iowa City Community School District in the County of Johnson, State of Iowa, be authorized to contract indebtedness and issue General Obligation Bonds in an amount not to exceed $191,525,000 to provide funds to address health, safety, and accessibility issues in all school buildings, including air conditioning all school buildings, reducing the use of temporary classroom structures in the District, addressing classroom, lunchroom, and gymnasium overcrowding, and dedicating rooms to art, music, prekindergarten, and science by constructing, furnishing and equipping a new building, constructing additions to and/or remodeling, repairing, and improving the school buildings remaining in the District’s Facilities Master Plan, as follows: Mann and Lincoln renovations, Liberty High athletic facilities construction and site improvements, new elementary school construction in North Liberty and site improvements, West High renovation, South East and North Central Junior High additions, Shimek renovation, City High addition and upgrades, Wood addition, Wickham upgrades, Garner and Northwest additions, Liberty High addition, Horn renovation, Kirkwood addition, Borlaug, Alexander, and Lemme additions, and Tate High addition and upgrades?It’s possible that the board could still make changes to the language, our administration has told us that we cannot wait any longer to settle the language, so significant changes are probably unlikely.
Here is a red-lined version showing changes from the previous draft (underlined portions represent new language):
Shall the Board of Directors of the Iowa City Community School District in the County of Johnson, State of Iowa, be authorized to contract indebtedness and issue General Obligation Bonds in an amount not to exceed $191,525,000 to provide funds to address health, safety, and accessibility issues in all school buildings, including air conditioning all school buildings, reducing the use of temporary classroom structures in the District, addressing classroom, lunchroom, and gymnasium overcrowding, and dedicating rooms toI don’t know what motivated the change in the order of science, music, and art. The one word that has been added is “prekindergarten,” apparently to address the objections of those who want some attention to expanding preschool space in the district. I’m not sure how much weight to put on the addition of that word, however, since it is not tied to any particular building, and is unaccompanied by any change in the bottom-line dollar figure. Is it just lip-service to the preschool idea without any associated funding? Is it there to enable a future board to change the facilities master plan to direct some of the bond funding toward preschool rooms and away from its currently designated uses? Or is there another possible meaning?science, music andart, music, prekindergarten, and science by constructing, furnishing and equipping a new building, constructing additions to and/or remodeling, repairing, and improving the school buildings remaining in the District’s Facilities Master Plan, as follows: Mann and Lincoln renovations, Liberty High athletic facilities construction and site improvements, new elementary school construction in North Liberty and site improvements, West High renovation, South East and North Central Junior High additions, Shimek renovation, City High addition and upgrades, Wood addition, Wickham upgrades, Garner and Northwest additions, Liberty High addition, Horn renovation, Kirkwood addition, Borlaug, Alexander, and Lemme additions, and Tate High addition and upgrades?
Many people have asked about whether passage of the bond referendum locks the district in to doing the projects listed in the bond language or in the district’s facilities plan. That turns out to be a complicated legal question to which the answer is not entirely certain; I’ll be posting more about that issue.
Please chime in with comments about the draft language.
Tuesday, April 11, 2017
Ballot language for the bond proposal
This afternoon, the district’s administration released the following proposal for language to use on the ballot for the district’s bond proposal:
Shall the Board of Directors of the Iowa City Community School District in the County of Johnson, State of Iowa, be authorized to contract indebtedness and issue General Obligation Bonds in an amount not to exceed $191,525,000 to provide funds to address health, safety, and accessibility issues in all school buildings, including air conditioning all school buildings, reducing the use of temporary classroom structures in the District, addressing classroom, lunchroom, and gymnasium overcrowding, and dedicating rooms to science, music, and art by constructing, furnishing and equipping a new building, constructing additions to and/or remodeling, repairing, and improving the school buildings remaining in the District’s Facilities Master Plan, as follows: Mann and Lincoln renovations, Liberty High athletic facilities construction and site improvements, new elementary school construction in North Liberty and site improvements, West High renovation, South East and North Central Junior High additions, Shimek renovation, City High addition and upgrades, Wood addition, Wickham upgrades, Garner and Northwest additions, Liberty High addition, Horn renovation, Kirkwood addition, Borlaug, Alexander, and Lemme additions, and Tate High addition and upgrades?The new language was added to tonight’s board meeting agenda, which means the board could vote to approve it tonight—though, since it will have been public for less than six hours before the meeting, the board could choose to postpone approval until our April 25 meeting.
Saturday, April 8, 2017
School board agenda for April 11
Some of the items on the board’s agenda this week:
We’ll start the meeting by holding “public hearings” on the proposed certified budget for fiscal year 2018 and the Shimek playground renovation proposal. (At our last meeting, the board approved the purchase of the playground equipment; this hearing is about the renovation work itself.) Members of the public will have the opportunity to speak and to ask questions about those topics. I posted about the Shimek playground proposal here.
We’ll vote on adopting the certified budget, which we have to submit to the state by April 15. (More detailed information here.) At our last meeting, I pointed out that it didn’t make much sense to schedule the public hearing on the certified budget on the same night that we have to vote on it, since we’d have no time to incorporate any feedback we receive at the hearing. In other words, the board seems to treat these public hearings (and arguably the entire budget-setting process) as perfunctory. In the future, I’d like to see the board take a meaningful look at how it’s allocating the district’s resources and whether it reflects our real priorities; that should involve consideration of community input, too—all well in advance of the state deadline for budget certification.
We may vote on bond proposal language to appear on the ballot in September; it’s not clear whether the final proposal will be ready this week, or whether we’ll continue to discuss the proposal at our work session and then schedule a vote for the next board meeting.
We’ll hear updates on special education and on the legislative session.
We’ll review proposed amendments to our board ends policies (here and here), to some of our policies directed at students, and to the charter for ourEducation Committee board committees. (UPDATE: The item about the committee charters has been removed from the agenda and sent back to committee for further consideration.)
At our work session, we’ll discuss the facilities master plan, the bond proposal, and our future use of the ThoughtExchange platform. Previous post on ThoughtExchange here.
All that and more! The full agendas are here and here. Feel free to chime in with a comment about anything that catches your attention.
We’ll start the meeting by holding “public hearings” on the proposed certified budget for fiscal year 2018 and the Shimek playground renovation proposal. (At our last meeting, the board approved the purchase of the playground equipment; this hearing is about the renovation work itself.) Members of the public will have the opportunity to speak and to ask questions about those topics. I posted about the Shimek playground proposal here.
We’ll vote on adopting the certified budget, which we have to submit to the state by April 15. (More detailed information here.) At our last meeting, I pointed out that it didn’t make much sense to schedule the public hearing on the certified budget on the same night that we have to vote on it, since we’d have no time to incorporate any feedback we receive at the hearing. In other words, the board seems to treat these public hearings (and arguably the entire budget-setting process) as perfunctory. In the future, I’d like to see the board take a meaningful look at how it’s allocating the district’s resources and whether it reflects our real priorities; that should involve consideration of community input, too—all well in advance of the state deadline for budget certification.
We may vote on bond proposal language to appear on the ballot in September; it’s not clear whether the final proposal will be ready this week, or whether we’ll continue to discuss the proposal at our work session and then schedule a vote for the next board meeting.
We’ll hear updates on special education and on the legislative session.
We’ll review proposed amendments to our board ends policies (here and here), to some of our policies directed at students, and to the charter for our
At our work session, we’ll discuss the facilities master plan, the bond proposal, and our future use of the ThoughtExchange platform. Previous post on ThoughtExchange here.
All that and more! The full agendas are here and here. Feel free to chime in with a comment about anything that catches your attention.
Tuesday, April 4, 2017
Information on tonight’s meeting about the renovations to Horace Mann Elementary
The school board will meet with the Iowa City City Council tonight (at 5 p.m. at the Educational Services Center) to discuss options for the renovations to Horace Mann Elementary School. The project is part of the district’s facilities master plan, but the details of the renovation project are still unsettled. Board members and council members just last night received a PowerPoint document showing several options for how to proceed with those renovations. There is no public comment period on tonight’s agenda; I’m assuming (hoping?) that tonight’s meeting will be just the first step in presenting options to the community for discussion. Feel free to chime in with a comment below!
Sunday, April 2, 2017
Rubber stampism
Shimek Elementary School playground, 2017
Should elected board members automatically approve decisions that are recommended by district committees?
At last week’s meeting, the board considered a proposal to replace the play structure at Shimek Elementary School. The proposal was recommended by the district’s central administration and endorsed by a Shimek PTO committee, but some Shimek parents raised objections. They argued that the proposed play structure was not sufficiently accessible to disabled students—one of the speakers was accompanied by her son, who was in a wheelchair—and that the district had, in short, given them the runaround in the way it handled the proposal.
Board members didn’t receive the parents’ objections (which were lengthy) until less than twenty-four hours before the meeting, which was fairly understandable, since the item didn’t appear on the agenda until a few days before that. So I suggested that we table the issue for two weeks to give us more time to consider the objections that parents had raised.
During the discussion, my fellow board member, Brian Kirschling, argued that when there is an internal process in place for developing a proposal, the board should defer to that process and accept its outcome. Though I’ve seldom heard this argument made so explicitly, there’s little question that some version of it seems to drive many board decisions. Once an administrative recommendation has been made, it often seems as if some board members are hunting for ways to justify it and reject other possibilities.
I very much disagree with this philosophy. There’s no question that board members do rely on administrative recommendations all the time—as a practical matter, we have to. Moreover, committees and task forces play a valuable role in evaluating the options for addressing a given issue. But when someone raises plausible objections to a recommendation, the board should not just rubber-stamp the recommendation without exercising independent judgment. It’s the board’s job to provide oversight and to be a conduit for community input, not to simply let the institution run itself.
Many of our committees, for example, are composed mostly of district staff, and even when they aren’t, they often have to rely on staff for the information they need. It certainly makes sense to draw on the insights and knowledge of staff in any kind of decision-making, but it would be unrealistic to ignore the fact that staff members have to worry about pleasing their supervisors—especially in a district with a reputation for having a retaliatory culture where dissent is often unwelcome.
And many times it’s the our administrators who determine committee membership in the first place—which can certainly have a big effect on what a committee ends up recommending. Even when all of the committee members are working in good faith and bringing valuable knowledge to bear, this kind of process can end up being used to give a veneer of community input to what are actually predetermined outcomes.
The hands-off approach seems particularly unwise on an issue involving the needs of disabled students, who make up a small fraction of our student population. The mere fact that a proposal wins majority support of a committee does not mean that the needs of a small minority have been fairly considered.
None of this means that the Shimek playground proposal was a bad one or that the process leading to it was faulty. But the board owed it to the public to take a closer look than it did.
Subscribe to:
Posts (Atom)